Roll-Down Shutter Installation Overview


  1. Lay rolling shutter housing, curtain, guide rails, and hardware out on a drop cloth near the opening to be covered. Remove the front cover of the housing. Click here to watch the video.
  2. Drill 1/4" holes through the back of the housing 15"-18" apart. (Holes can be drilled above or below the axle or through the roof the the housing depending on field conditions)
  3. Connect the guide rails to the housing by sliding them over the legs that protrude from the end caps of the housing unit.
  4. Place the shutter up against the wall. Adjust the proper height and equal distance on each side of the shutter by securing the top guide rail hole to the opening using 2 1/4" tapcons provided to you.  
  5. Make sure the housing and guide rails are square on the wall. Many beginners mark a vertical line with a pencil along the side guide rail. You can also make a mark at the top of the end cap. Mark the location of the other pre-drilled guide rail holes. Remove the support and carefully lower the shutter to a flat surface. (If the shutter is going to be operated from the inside a hole will need to be marked for the universal to go through the wall)
  6. Drill appropriate holes where marked. When done secure guide rails and housing unit following the pre-drilled holes. 
  7. Drill and attach the bottom angle (if applicable)
  8. Remove the curtain from the bubble wrap and attach the slat hangers 18" apart to the top blade of the curtain.
  9. Slowly slide the curtain over the axle letting it gently slide down the guiderails until it comes to rest on the bottom angle. (Bottom angles are not provided if the shutter is going to come to rest on a window sill or a patio deck)
  10. Attach the slat hangers to the axle using the 1/2" self drilling screws provided.
  11. Insert the universal through the gear.(manual shutters only)
  12. Use the crank handle to check the operation of the shutter before replacing the housing cover.
  13. Caulk guiderails and gently wipe down your shutter. Install deco caps in each guide rail.

Click here to watch an installation video.

Get Prepared Today! Call Us to Order:
95
4-474-3557 or 1-888-474-3555
or Email Us for a Free Quote in Your Area!

<< Back to Home Page

 

 
Turn Around Times:
Accordions : 7 - 10 Days
Roll-Downs : 7 - 10 Days
Storm Panels : 3 - 5 Days
Clear Panels : 3 - 5 Days
Impact Windows : 2 - 3 Weeks
Bahamas : 2 - 3 Weeks
Hurricane Fabric : 3 - 5 Days
 
Testimonials

Stan W. - September - 2009 - Ft. Lauderdale, FL
Rita and I want to once again express our appreciation for all that you've done for us. Without your help what has been very difficult would have been impossible. We wish you all the best in the years ahead.

Robin B. - September - 2009 - Sunrise, FL
Thank you so very much for making my house into a much better home.  All of your improvements mean more than you know to me.  I sincerely appreciate your talents and rely heavily on your expertise. You are the best!

Read more
 
 
Subscribe Newsletter:
Sign-up to our Monthly Newsletter for the latest news.
Name :
 
We Ship Worldwide
Association Member
Association Member
Chamber Member
Corporate Sponsor
Order with Confidence