Call today itself
 

Roll-Down Shutter Installation Overview


 

  1. Lay rolling shutter housing, curtain, guide rails, and hardware out on a drop cloth near the opening to be covered. Remove the front cover of the housing. 
  2. Drill 1/4" holes through the back of the housing 15"-18" apart. (Holes can be drilled above or below the axle or through the roof the the housing depending on field conditions)
  3. Connect the guide rails to the housing by sliding them over the legs that protrude from the end caps of the housing unit.
  4. Place the shutter up against the wall. Adjust the proper height and equal distance on each side of the shutter by securing the top guide rail hole to the opening using 2 1/4" tapcons provided to you.  
  5. Make sure the housing and guide rails are square on the wall. Many beginners mark a vertical line with a pencil along the side guide rail. You can also make a mark at the top of the end cap. Mark the location of the other pre-drilled guide rail holes. Remove the support and carefully lower the shutter to a flat surface. (If the shutter is going to be operated from the inside a hole will need to be marked for the universal to go through the wall)
  6. Drill appropriate holes where marked. When done secure guide rails and housing unit following the pre-drilled holes. 
  7. Drill and attach the bottom angle (if applicable)
  8. Remove the curtain from the bubble wrap and attach the slat hangers 18" apart to the top blade of the curtain.
  9. Slowly slide the curtain over the axle letting it gently slide down the guiderails until it comes to rest on the bottom angle. (Bottom angles are not provided if the shutter is going to come to rest on a window sill or a patio deck)
  10. Attach the slat hangers to the axle using the 1/2" self drilling screws provided.
  11. Insert the universal through the gear.(manual shutters only)
  12. Use the crank handle to check the operation of the shutter before replacing the housing cover.
  13. Caulk guiderails and gently wipe down your shutter. Install deco caps in each guide rail.

 

Tools Required:

Electric or 18V drill 
3/16 cement drill bit 
5/16" socket drive
Extension cord

Materials Required:
 

2 ¼” x ¼” tapcons – Supplied free with your order.

Our staff can walk you through any issue you may have with accordion shutter installation. If you have problems we are here for you. 

Get Prepared Today! Call Us to Order:
95
4-474-3557 or 1-888-474-3555
or Email Us for a Free Quote in Your Area!

<< Back to Home Page

 
arrow
TESTIMONIALS

Jan T – November – 2018 – Ponte Vedra Beach, Florida

Barbara, I just wanted to tell you the storm panels went up very nicely and you sent me all the proper panels. I'll be ordering the panels for the rest of the house after the holidays. Thank you again for your assistance and it was a pleasure working with you.

 

Mike G. - October - 2018 - Port Charlotte, Florida

Excellent Product!   Thank you Ryan.   Please pass my thanks along to Bill and the rest of the team as well.   I am really impressed with the system we received.   Thank you all for continuing that quality product with good support.

 

Robert H. - September - 2018 - Beaufort, South Carolina

My Accordion Shutters are up!   The windows took about 1.5 hours each. The shutters all fit very nicely, the material and finish is excellent, and they look very good. They are not intrusive at all.  I am pleased, my wife is pleased ( you know that is important) and my neighbor, who helped me was impressed based upon his window/door experience.
Good job! Thanks.


Marcus J. - August - 2018 - St. John, U.S Virgin Islands

Hello everyone at Empire, Marcus from St. John here. 
This project is being done by me and 1 helper, and we're going back much stronger, with many more tap cons, and wedge anchors than the original installers had done.
Your rolling shutters are amazing, great quality and workmanship. Everything is going great so far!


David G. - July - 2018 - Sarasota, Florida

We wanted to self-install so we bought accordions and roll downs from Empire Construction.  We measured our window and patio and sent Empire the specs.  The shutters were an exact match.  Installation is very doable for two reasonably mechanical people.  In this case it was only one mechanical person and some extra hands. The accordions were a breeze as installation was mostly marking holes for spots, drilling holes, and screwing them in.  Our accordions have locking pins that hold them open and act as a second lock when closed. Even if a projectile breaks the lock the rods will keep the shutters closed.  These shutters are Bertha HV1. They are High Velocity Hurricane Zone Approved. Having seen a wide range of shutters we are extremely happy with the quality of the product we received!!


Jim J. - June - 2018 - Homestead
, Florida

I installed fourteen aluminum accordion shutters which I purchased from Empire Construction.  I could not be happier with my choice.  The shutters are made very well and are powder-coated.  The purchase included all of the required hardware which was powder-coated to match the shutters.
  The company is very customer-oriented.  Michael and his staff were wonderful.  They were attentive, helpful, and a delight to work with.  The installation video on the website made the installation  very easy. I highly recommend Empire Construction to anyone considering a purchase of hurricane shutters.  Thanks again.  Please say Hi to everyone,

 
Steffan L. - May - 2018 - St. Croix, US Virgin Islands, Florida

I picked up my shipment today at Paradise freight here on St Croix. Your shipping (and your products) deserves the highest rating. Thanks for excellent service..

arrow
PRODUCTION TIME
Accordions : 8 - 10 Weeks
Bahamas & Colonials : 10-12 Wks
Clear Panels : 10 - 14 Days
Hurricane Fabric : 5 - 6 Weeks
Rolling Shutters : 10 Weeks
Storm Panels : 10 - 14 Days

 

 


 

  Hurricane Shutters made in the USA

Finance Your Shutters with PayPal!



ABOUT SSL CERTIFICATES